DEX: (D003) task_set — Task Set | Date: 2010/03/25 17:49:46 Revision: 1.80 |
This DEX enables the transmission of a set of task specifications. The data exchanged may be used as part of a support solution, e.g. a prime contractor developing a set of tasks for an aircraft.
The result is a requirement to create, transfer, review and approve a (set of) task specification(s) for a contracted item from the prime contractor. Information will be created including;
The Task Set DEX deals with information required to maintain the product in order to sustain or regain an acceptable product state. A task specification does not plan, schedule, or record what has been done.
It is usual for the task specification to be derived from a formal analysis process such as Logistic Support Analysis (LSA).
The detailed set of business activities are detailed in the PLCS Activity Model section.
A task specification is initially prepared during the latter stages of the detail design and development phases and is continuously assessed and adjusted throughout the lifetime of a system or product.